Polska flaga Europejska flaga

Platinium Business Park Complex

Implemented systems: Reynaers

Facade area: 26 000m2

Building height: 25m

Year of completion: 2012

Platinium 3:

  • Modular windows – REYNAERS CS99-SG-HV – 2568 m2
  • Aluminum-glass facades – REYNAERS CW50 – 1807 m2
  • Elevational cladding REYNACLAD with aluminum sheet – 1905 m2

Platinium 4:

  • Modular windows – REYNAERS CS99-SG-HV – 3267 m2
  • Aluminum-glass facades – REYNAERS CW50-SC – 812 m2
  • Elevational cladding REYNACLAD with aluminum sheet – 5821 m2
  • Blinds on the technical floor Solar-Tech – 370.37 m2
  • Suspended glass ceiling – 136 m2

Platinium 5:

  • Modular windows – REYNAERS CS99-SG-HV – 3119 m2
  • Aluminum-glass facades – REYNAERS CW50-SC – 474 m2
  • Elevational cladding REYNACLAD with aluminum sheet – 4180 m2
  • Blinds on the technical floor Solar-Tech – 363 m2
  • Suspended glass ceiling – 1156 m2
Platinium Business Park - reconal

Project Gallery - Platinium Business Park

Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal

Distinctive Elements

wyróżniki

Platinium Business Park - reconal
Platinium Business Park - reconal
Platinium Business Park - reconal

INVESTMENT DESCRIPTION

The Platinium Business Park office complex was constructed in Warsaw, in the Mokotów district at Domaniewska 42/44, corner of Wołoska. The construction of the buildings started in November 2006 and was completed in 2012. The total area of these seven-story buildings is 64,000 square meters, with the majority dedicated to office space – 60,000 square meters, and the rest for commercial and service premises – 4,000 square meters. The developer of the investment is Globe Trade Centre, the general contractor is the construction company Warbud, and the architectural design is by JEMS Architekci based in Warsaw. Nearby, you can find the National Fund for Environmental Protection and Water Management office building, the Saturn office building, and the Toyota Building.

ADDITIONAL INFORMATION

  • Six volumetrically similar buildings creating a unified block of development.
  • The complex was constructed in stages, with the first office building completed in December 2007, Building B in July 2008, and Building C in November 2009.
  • A park with a shallow pond will be created between the buildings.
  • The total value of the investment is approximately 90 million euros.
  • All buildings within the complex will offer Class A office space.
  • The ground floors of the buildings are largely designated for service points.

Source – urbanity.pl

Other projects

airport terminal - reconal
Poland / Rzeszow

Airport Terminal Rzeszów-Jasionka

About project
Roundabout Dome - Reconal
Poland / Katowice

Dome above the Ziętka traffic circle

About project
Skip to content